Fastline Films
BTF training films and historical bonus films
Correct as of 11.09.20
| No. | Title | Disc | Running Time |
Collection | |
|---|---|---|---|---|---|
| FF01 | Mechanical Signalling And Level Crossings | 1 | Layout Of Signal Connections (1955) | 33 Mins | ![]() |
| Maintenance Of Signals And Connections (1955) | 33 Mins | ||||
| Historical Bonus Film: Right Down The Line (1951) | 18 Mins | ||||
| 2 | Level Crossing Gates: Part 1 - General (1956) | 15 Mins | |||
| Level Crossing Gates: Part 2 - Mechanisms (1956) | 10 Mins | ||||
| Level Crossing Gates: Part 3 - Maintenance (1956) | 20 Mins | ||||
| Historical Bonus Film: Walton Street Crossing (1962) | 5 Mins | ||||
| Historical Bonus Film: Safety On The Track (1951) | 13 Mins | ||||
| FF02 | Plain Line | 1 | Day To Day Track Maintenance: Part 1 - Plain Line (1951) | 29 Mins | ![]() |
| Track Buckling And Its Prevention (1951) | 15 Mins | ||||
| A Mechanical Rail Creep Adjuster (1951) | 16 mins | ||||
| 2 | Measured Packing: Part 1 - Straight Track (1953) | 48 Mins | |||
| Measured Packing: Part 2 - Curved Track (1953) | 18 Mins | ||||
| Historical Bonus Film: Gantries | 15 Mins | ||||
| FF03 | Swtiches And Crossings | 1 | Mechanical Point Operation: Part 1 - Layout Of Rodding & Connections (1954) | 15 Mins | ![]() |
| Day To Day Track Maintenance: Part 2 - Switches & Crossings (1951) | 22 Mins | ||||
| Adjustment Of Double-Ended Points (1954) | 7 Mins | ||||
| Historical Bonus Film: MFD Re-Railing Equipment (1956) | 30 Mins | ||||
| 2 | Mechanical Point Operation: Part 2 - Maintenance Of Rodding And Connections (1954) | 18 Mins | |||
| Mechanical Point Operation: Part 3 - Maintenance Of Points And Fittings (1954) | 27 Mins | ||||
| Historical Bonus Film: Mechanised Renewal Of Plain Line (1956) | 32 Mins |
Collection
Wanted
For Sale/Exchange
